Do not look at the ten points you will regret in the decoration


I. Substrate Handling Stealing Index: ★★★★★
Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.
Reminder: In the paving construction of wall tiles and floor tiles, we must pay attention to the fact that ceramic tiles cannot be directly laid on the surface of lime mortar, lime plaster, lime paper plaster, hemp stone mortar and latex paint, but the base layer must be treated cleanly. Can be laid behind. Bonding pastes used between tiles and substrates should be formulated in strict accordance with the construction standards and proportions, using the specified grades of cement and adhesive materials, and they cannot be randomly deployed. When applying latex paint, be sure to pay attention to whether the shading of the wall putty is even and smooth, whether the sanding and rolling are in place. In addition, pay attention to whether the latex paint is properly proportioned.



Second, the ground leveling sharks index: ★ ★ ★ ★ ★
Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevenness”, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building.
Reminder: Before doing leveling on the ground, you must first do a good job of the ground floor treatment, and then use cement mortar to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.



Third, small face processing jail workers index: ★ ★ ★ ★ ☆
Phenomenon: "Small face" is a small place that ordinary people can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window board, the inside of the heating cover, etc. Some workers will cut corners here. It will even do nothing.
Reminder: Remember that there are 6 planes for any object. Don't ignore any details when checking the quality of the project.


Fourth, the wire wear pipe stealing index: ★ ★ ★ ★ ☆
Phenomenon: In the home improvement construction, almost all wires are put in PVC pipes and buried in the walls. After the wires were put into the PVC pipe, the owner couldn't see it at all, and it was difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If workers cut corners, they will use wire with connectors or put several wires in the same PVC pipe.
Reminder: It is best for the owner to purchase the wires or specify the brand. Then supervise the worker's operation on the site, and check the power-on after installation. In addition, the decoration company must leave a "pipeline map." When the electrician had just buried the wires in the wall, he could number the walls and draw a floor plan. Then he used the strokes to draw the direction of the wires and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.



Fifth, seam modification sharking index: ★ ★ ★ ★
Phenomenon: In some places where the wall meets the door and the window, and where the two different colors of paint are docked, it is also where the workers often perfunctory. We often see mixed paint between latex paint and wood, and various problems at the joints.
Reminder: The treatment of joints is very important. We must supervise the workers' construction. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.


Sixth, the wall tick slotting index: ★ ★ ★ ☆
Phenomenon: The buried pipeline must be slotted on the wall and the ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.
Reminder: Before construction, we must reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing unnecessary trouble to the residents downstairs.

Seventh, wall and floor tile stealing index: ★ ★ ★
Phenomenon: Paving wall tiles and floor tiles are a highly technical process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding.
Reminder: According to the "Household Decoration Engineering Construction Specification" promulgated by the Ministry of Construction, the requirements for wall and floor tiles should be flat and solid, clear patterns, no dirt and paste marks, the surface color is basically the same, uniform seams, no cracks, out of angle And lack of edge, local emptying must not exceed 5% of the total.


Eight, wire connector stealing index: ★ ★ ☆
Phenomenon: When the electrician installs sockets, switches, and lamps, it does not wire according to the construction requirements. In particular, when the owner uses some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets cause heat and even burn, which brings great losses to the owners.
Reminder: In the construction supervision of the electrician in strict accordance with the operating procedures for construction, after all switches, sockets installed, must be the actual use to see if these parts have a fever.



Nine, the sewage pipeline stealing index: ★ ★
Phenomenon: During the renovation of the construction team, in order to save time, a large amount of concrete, sand, and concrete fragments are poured into the sewer. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water.
Reminder: Strictly supervise the construction team and do not use the sewers as garbage paths. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then the water is discharged at the same time to see if the water is unobstructed and if there is any leakage of the pipeline.


Ten, wall painting sharks index: ★ ☆
Phenomenon: Latex paint is the most common wall decoration material. It can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur.
Reminder: Before the use of latex paint to add a certain amount of water, deployment of a good latex paint to be used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.
Beware of the above ten decoration kitten tired, easily save a fortune!

Decoration decoration company okay decoration materials brand home improvement decoration steps decoration materials knowledge

Shower rod, Shower Reinforcement Bar also call shower glass support bar or glass panel bracing bar, it mounts directly to the wall or ceiling to secure vertical fixed glass panels at multiple angles.

A great solution for glass panel needing to be secured to an adjacent wall for stability but that wall is not at 90° to the fixed panel or glass-to-ceiling application is not a standard angle.

 

Specification

1. Material: Brass Head/ Mount+ Stainless Steel Bar

2. Surface: Chrome Polished Finish

3. Suitable for 6-12mm glass

4. NO glass cut-out / drilling needed

5. Length: 300-500mm, accept customize length. More flexible: adjustable length or cut-to-short  to customize fit for your bathroom.

6. Installation: Shower Screen Support Bar assembled without notch or drilling hole in the glass (thru-glass supply bar also available). Holds the glass panel in place with an adjustable clip tightened by a plastic tipped screw.

7. 45°, 90° or Multi-Angle fixing option; Wall-to-Glass, Ceiling-to-Glass or Glass-to-Glass 

 

Shower Rod

Shower Rod,Shower Curtain Rod,Shower Curtain Rail,Curved Shower Rod

Jiangyi Industrial Co., Ltd , https://www.cnjyhardware.com