Eliminate the hidden danger bath installation construction needs one step in place

The bathtub is a large object in the bathroom. The installation and construction need to be in one step. If the construction and installation are not in place, it will bring hidden dangers to the home life in the future. The following small series introduces you to the installation points and installation precautions of the bathtub.

Bathtub installation process

Installation in the water → tightly closed putty → installation on the water → flattening the bathtub

Bathtub installation points

1. When installing the skirt bathtub, the bottom of the skirt should be close to the ground. The floor should be reserved for 250~300mm holes in the drainage area, which is convenient for drainage installation. The inspection hole is installed in the wall of the bathtub drainage end.

2, other types of bathtub can determine the height of the plane on the bathtub according to the relevant standards or user needs. Then install two bathtubs and install the bathtub. If the side of the bathtub is built on the side of the bathtub, a manhole should be provided at the drain of the bathtub or a manhole should be provided on the wall at the end of the drain.

3, the height of various bathtub cold, hot water taps or mixing faucets should be 150mm above the plane on the bathtub. The chrome plating should not be damaged during installation. The chrome cover should be in close contact with the wall.

4. The height of the fixed shower and hose shower can be installed according to relevant standards or according to user requirements.

5. The upper surface of the bathtub must be leveled with a horizontal ruler and must not be inclined. Apply a sealing paste to the side of the upper side of the bathtub and the wall.

6, the bathtub drain and drain pipe connection should be firm and compact, and easy to disassemble, the joint should not be open.

Bathtub installation precautions

1. Do not damage the waterproof layer. If it has been damaged or has no waterproof layer, it must be waterproofed first and tested by water leakage for 12 hours.

2, fixed firmly, pipe interface is tight.

3, pay attention to the protection of finished products to prevent bumps.