(1) Before the outer frame is dismantled, the foreman shall make a written and safe submission to the demolition construction personnel. At the end of the transaction, the recipient signed it.

(2) Before the demolition, the team must learn the safety technical operation procedures. The team must make a safe disclosure of the demolition personnel. There must be records on the bottom of the demolition, and the contents must be targeted. The notices on the demolition must be made clear.

(3) Before the demolition of the frame, the fence shall be pulled on the ground with a rope or wire. No guardian, no safety staff leader shall be present, and the outer frame shall not be removed.

(4) The procedure for dismantling the shelves shall be from top to bottom and shall be removed step by step. First clear up the rack debris, such as the concrete on the scaffold board, mortar block, U-card, activity poles and materials. According to the principle of demolition, the pole should be taken apart first. Scissor braces and tie rods are not allowed to be removed at one time. Which poles are required to remove the rods, and to which layer the scissor rods and tie rods are removed?

(5) Dismantling the process flow: remove the guardrail → remove the scaffolding → remove the small cross bar → remove the large cross bar → remove the scissors support → disassemble the pole → transfer the rod to the ground → remove the fastener → press the specification stacking.

(6) Two to three people must operate cooperatively when dismantling the rod and putting the rod. When the large rod is dismantled, the person standing in the middle should pass the rod down and the person below should take the rod and hold it firmly. It is forbidden for the personnel to loosen their hands, and it is forbidden to throw their feet down.

(7) Demolition workers must wear safety belts. During the demolition process, a person with strong sense of responsibility and high technical level should be assigned as the commander to take charge of all the safety operations of the demolition work.

(8) When the frame is removed, there must be no obstruction to the pipeline. At the same time, it is necessary to pay attention to the snapping of the fastener and to avoid stepping on the sliding rod.

(9) When removing the rack, the turnbuckle must be removed from the steel pipe, and the turnbuckle must not be on the removed steel pipe.

(10) The demolition personnel should be equipped with tool sets. When holding the steel pipe in the hand, they are not allowed to take the wrench at the same time. After the tool is used, it must be placed in the tool sleeve.

(11) Do not sit on a shelf or in an unsafe place during the break. It is strictly forbidden to play in the demolition.

(12) The demolition personnel should wear personal labor insurance products, and wear rubber-based easy-to-slip shoes on the shelf. Clothes should be light.

(13) During the demolition, no person shall be replaced, and if the replacement personnel must re-submit the safety technology.

(14) The removed foot poles should be removed, cleaned, and transported, and classified, piled, and coded in order. Waterproof measures are necessary to prevent rust after rain. Fasteners should be kept in separate models.

(15) The removed steel pipe should be periodically re-externally brushed with an anti-rust paint and brushed with a paint. Bend straight pipe, fasteners to oil lubrication.

(16) It is strictly forbidden for shelf workers to perform racking and dismantling work at night. Unfinished matters The foreman shall make a detailed disclosure in the safety technology disclosure. Where there is a problem in the construction, he shall promptly contact the technical department in order to promptly correct it.

Copyright Statement: This article is reproduced from online media and represents only the author's opinion. It has nothing to do with this site. If news articles and comments infringe your legal rights, please call us and we will handle it in a timely manner.

1. Product introduction

   Coal-based column desulfurization column Activated Carbon used high quality Anthracite as raw material. Adding a certain proportion of adhesive, auxiliary catalyst, by selection, proportioning, grinding, molding, drying, carbonization, activation and deep processing made. 


2. Application

   This product is mainly used in all kinds of gas, such as water gas, semi water gas, coke oven gas, natural gas, carbon dioxide gas, city gas, synthetic ammonia process gas, and exhaust gas in sulfur dioxide chemical raw materials and other containing mercury. It also used for adsorption of flue gas of power plant equipment, including the removal of sulfur dioxide and saltpeter, which replace the lime desulfurization process before. It also applies to other gas that contains mercury cannot get rid of the low concentration, which is equal to or below the national emission standard.  

3.Transportation and Packing

 Woven bag, lined with plastic film bags, each 25kg can also be packaged according to customer demand. The product should be placed in a cool and dry place during storage; When transportation, it prevents to mixed with hard materials, to prevent carbon particles broken that affecting the quality of packaging, to prevent breakage. To avoid leakage or mixed with debris; to avoid water, oil and fire.



Column Desulfurization Column Activated Carbon

Activated Carbon Filter Paper,Desulfurization Activated Carbon,Solvent Recovery Activated Carbon,Sewage Treatment Activated Carbon

Ningxia YiFeng RuiDa Activated Carbon Co.,LTD , https://www.nxyfrdhxt.com