Wood floor construction essentials

>>> Links: Master Points Easy Installation of Solid Wood Flooring

1. Install the floor keel before installing the floor, and then pave the wooden floor.

2. The installation of the keel should be done on the ground as a pre-embedded part to fix the wooden keel. The embedded parts are Bolts and lead wire. The distance between the embedded parts is 800 mm and it is drilled from the ground.

3. The installation method of wood floor: solid wood floor should have a base panel, the base panel uses a large core board.

4. After the floor covering is completed, the surface is planed and planed with a plane, the floor surface is cleaned, the floor paint is applied, and the polish is applied to the wax.

5. After all wooden floors have been transported to the construction site, they should be unpacked and stored in the room for more than one week so that the wood floors can be used in accordance with the room temperature and humidity.

6. The wooden floor should be selected before installation, removing defective products with obvious quality defects. The same pattern of color patterns spread in the same room, there is a slight lack of quality but does not affect the use, can be placed on the bottom of the bed, cabinets and other furniture to use, the thickness of the same room must be the same. At the time of purchase, it should be purchased at the expense of a 10% increase in actual paving area.

7. The keels of wood flooring should be made of pine, fir and other non-deformable tree species. The back of wooden keels and skirting boards should be treated with anti-corrosion treatment.

8. Paving solid wood floors should be avoided under heavy rain, rainy weather and other climatic conditions. It is best to keep the indoor temperature and humidity stable during construction.

9. The wooden floor in the same room should be finished at one time. Therefore, sufficient auxiliary materials should be prepared, and the finished product should be protected in time to prevent oil pollution, juice, and other contaminated surfaces. The glue that has been squeezed out during installation must be wiped off in time.

Precautions

1. Laminated flooring of wooden floor should ensure that the cement mortar floor can not be sanded or cracked, and the ground floor must be cleaned.

2. Grass-roots unevenness applies cement mortar leveling and paving wood floors. The base layer moisture content is not more than 15%.

3. When glueing wooden floor glue, make it thin and even. The height difference between two adjacent wooden floors does not exceed 1 mm.

Flooring Room Cement Furniture Paint