Renovation of several important acceptance stages

The quality of a home improvement project depends on the construction level of the decoration company. It also depends on the acceptance and daily supervision of the owner. If you only check after the completion of the project, the overall quality of the project will not be fully understood. Then, at what stage should the owner accept it? Below, briefly describe the major acceptance stages that require attention.

First, the acceptance before starting the decoration construction

Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement.

Second, the acceptance of the water circuit

The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the line transformation under the operation of a professional hydraulic or electrician. Actual size. Only after the line is changed, the putty worker can continue to seal the wall and putty.

Third, according to the drawings on the carpentry work size acceptance

The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.

>>>Links: Live Photos: Helping You Carefully Acceptance and Away From Decoration

IV. Quality Acceptance of Carpentry Work

When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.

V. Quality Inspection of Oil Workers

After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.

Sixth, acceptance after completion

The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, the construction team should be required to clean the room thoroughly before being removed.

The acceptance stage is not absolute in the actual construction. Different families have different requirements for the decoration content, and the construction progress will naturally have corresponding adjustments, which can be flexibly controlled according to the progress of the project.