Master the characteristics of attention to detail can also be installed in the winter good room

The traditional concept that winter is not suitable for the renovation of new homes, many real estate can be delivered during this period, want to immediately renovate it, worry about the wrong season; reload it in the coming year, but also suspected shelved for too long. In fact, the winter decoration, just to prevent the winter home improvement of several "seasonal disease", rushed to live in a new home a year ago is not a bad idea.

Transport material attention waterproof

In winter, the climate is dry, and the moisture content in the wood reaches the lowest point in a year. At this time, the decoration construction can basically prevent cracking and deformation. However, it is necessary to avoid rain and snow transporting materials and prevent the snow from wetting the wood. After the decoration panel is transported to the construction site, it is necessary to use a dry towel to wipe off the floating dust and paint the back of the varnish twice. All decorative panels should be laid flat. A wood panel is placed on the bottom of the panel and a wood panel is pressed on the top panel. It is not possible to stand upright to prevent the panels from cracking and warping. In addition, the materials must be stored in a ventilated, dry place away from windows and water.

Seams pay attention to thermal expansion and contraction

Wooden items should pay attention to the treatment of left joints, fully consider the principle of thermal expansion and contraction, and control the joints of wooden boards. In winter due to low temperatures, the sheet is in contraction. If the joints are too dense and tight, the temperature of the spring and summer rises, the expansion of the sheet will cause the floor, furniture, doors and windows to bulge, deformation, or dislocation or even cracking. When laying solid wood flooring, it is best to leave around 3mm of expansion joints around, otherwise it will cause druming and dangling.

Paint job attention "warm"

According to the temperature in the product description, the ambient temperature of the latex paint construction should not be lower than 5°C. The ambient temperature of the commonly used mixed latex paint should be above 0°C, and the ambient temperature when the varnish is applied should not be lower than 8°C. . In addition, pay attention to ensure that the indoor temperature during construction at least not less than 5 °C, especially the paintwork should pay attention to "warmth", to be fully open after the doors and windows ventilation.

Water soaks before installing the tiles

Tiles must soak. Before the winter tiles are installed, they must also be treated with water soaked. It is necessary to make the water reach saturation, so that it will not be adhered to the cement due to the suction of water, resulting in weak bonding with the cement target=_blank>cement. Drum, shedding phenomenon. In addition, the temperature difference between indoor and outdoor in winter is great. Whether it is a wall brick or a floor tile, be sure to wait until it is suitable for the indoor temperature, so as to avoid empty drums and falling off after construction. Special attention should be paid to the jointing process after the paving of the tiles.

Wall putty can not be too thick

Putty on the wall cannot be too thick, because the air in the room is dry and the water loss is fast. It is easy to cause emptying, cracking, and wall inequality. The wall putty treatment is preferably performed at a relatively high temperature for a relatively high period of time, so as to prevent the newly scraped putty from freezing. After the first time the putty is completely dry, scrape it a second time. After the second time, the putty is completely dry and then sanded carefully. If the wall surface is partly concave, it is best to use gypsum powder plus white latex to reconstruct and repair the wall surface, which is convenient for quick drying. When there is a large crack on the wall, the local place will be scraped after two strips.

Prevent dry cracking of plasterboard

During the construction of gypsum board ceilings, about 1 to 2 cm of expansion joints are to be left between the gypsum board and the joint between the gypsum board and the wall surface. The gaps are first filled with putty and then double-stripped. , And then putty treatment. The wood keel used in the ceiling must be solid and must not be loosened. This will prevent plasterboard ceiling cracks. In addition, when cementing the inner corner of the plaster, leave a gap of about 0.5 cm with the top surface and the wall surface respectively, and use gypsum powder and latex to adjust the gap and prevent cracking of the plaster line.

Maintain ventilation to avoid contamination

After completion

Three trees paint interior decoration paint interior decoration window latex paint cement floor tile tile adhesive floor tile