Decoration Weapon: How to Rescue Soaking Flooring

In a modern family, the majority of the floors at home are always there. Whenever there is a time, the floor will inadvertently let the floor seep into the water. This time Xiaobian will give you a few strokes.


Hongxing solid wood flooring

At present, common households suffer from "floods" mainly due to pipeline leakage. According to their severity, they can be divided into:

1. A large area of ​​water soaked: water pipes cracked, heating water running.

2. Local soaking water: water pipe drip, hidden pipeline seepage, heating pipe drip, drinking fountain leaking, bathtub leaking and so on.

Soaking reaction

1. The seams at the floor seam are deformed.

2. The skirting board is deformed and bulging.

Treatment plan

1. Find and cut off water sources in time. 2. Clean the floor water. 3. Inform property and related manufacturers in a timely manner. 4. Photographed on-site to provide evidence for disputes.

Floor maintenance

1. Large areas of water soaking: For a variety of reasons caused by a large area of ​​water soaked in the floor, and a large amount of water, consumers should clean up the scene at the same time to inform the floor manufacturers customer service, and as soon as possible to remove the floor.

2. Local soaking water: Cut off the water supply and clean up the water on the ground in time to observe whether there are obvious changes in the floor. There is a noticeable edge reaction and the floor maker can be notified to make a partial replacement. The workers will perform partial removal according to the site conditions and calculate Required floor area for maintenance, accounting for related expenses.

3. Partial floor replacement: Before the workers come to the door, they need to check the stock and batch conditions of the floors that need to be changed, because only the floors with the same floor color and specifications can be used, otherwise they cannot be repaired.

4. Overall replacement, partial replacement of the floor: It is best to dry the ground for about two weeks while maintaining normal ventilation. After the ground is dry, reinstall it.


Decoration Experience Nature Flooring Del Floor Heating

Steel Structure Workshop

Steel Structure Building,Steel Structure Workshop Co., Ltd. , http://www.nssbuilding.com