Home improvement uniform production process

The first article: The work that needs to be done after the start of the job is started. Part II: The transformation of the wall-making process Part III: The water production process The fourth chapter: The electricity production process The fifth chapter: Waterproof and moisture-proof production process
Part VI: Woodworking Production Process Part Seven: Door and Window Cover Making Process Chapter Eight: Door Leaf Production Process Part Nine: Doorless Wardrobe Production Chapter Ten: Ceiling Production Process Article Eleventh: Deck Wall Manufacturing Process Twelfth Article: Paint Production (Water Paint)
Thirteenth: paint production (mixed water paint)
The fourteenth: paint production (mixed water clear)
The fifteenth chapter: Latex paint production process sixteenth: bricklayer production process seventeenth: solid wood floor pavement process

Part I: Work to be done before start of construction
1. Whether knocking walls on the ground is empty, such as emptying drums, requiring developers to eliminate redo;
2, kitchen, bathroom, balcony, terrace to do water-closing experiments, such as leaking to supervise the developer to rectify;
3. Connect the hot and cold water pipes, open the main valve and open the plugs one by one to see if the water passes through;
4, to protect all finished products (such as security doors, video phone doorbell, finished kitchen, gas meters, etc.) protection;
5, carefully check the strong and weak circuit is smooth, floor drain, water is fluent;
6, carefully check the wall beam column is skewed and so on.
Part II: Renovation of the wall
1, first use the cutting machine to cut the part to be removed and then hit, do not use a sledgehammer, so as not to affect the wall of the wall that is not removed;
2, first use a hammer to drill the bottom and then slowly upward play. The doorway of Xinyi's doorway should be beamed;
3, can not play part: bearing wall, concrete wall.
Part III: Water Production Process
1. The depth of hot and cold water pipes buried in the wall shall be 1cm between the wall of the pipe and the wall skin, strictly follow the principle of left hot right and cold;
2, the outlet must be strictly in accordance with the national standard spacing of the size of the layout, the internal and external wires to distinguish;
3, no clogging, connecting hot and cold water pressure test pump pressure 0.8MPA above no explosion, risk, drip, leakage. Unpressurized test cannot be wall-sealed;
4, after the tile is tiled, the hot and cold water inside the wire elbow can not stand brick surface;
5, after the water pressure test, open the main valve and open the plug one by one to see if the plug is blocked;
6. Draw accurate pipe layouts and submit them to the owner for preservation (preferably photos of the construction part can be saved).


Part IV: Electric Manufacturing Process
1, Guiji air conditioning walk 4 square separate circuit, the kitchen, bathroom, each walk 4 square loop one, lighting a 2.5 square circuit, ordinary socket to go 1-2 2.5 square circuit, do not use 1.5 square wire;
2. The separation distance between strong and weak electricity is more than 30CM. The distance between strong electric pipe and heating pipe (piece), hot water pipe and gas pipe should be greater than 30CM;
3, the same room power, telephone, television and other outlets should be at the same level elevation (except for special circumstances), strictly follow the principle of the left zero right fire line in the ground, the best use of the national standard ground wire yellow-green line;
4, into the box line with locking protection, the laying of the box to be flat, do not elbow, bends to bend or reed handle, take over the use of PVC glue welding. Strictly follow the principle of threading after the first pipe is buried. The place where the pipe cannot be buried at the top should be protected by the square pipe, and the naked bare wire and the ceiling wire must be fixed;
5, weak current can not have connectors (TV line to use divider), network cable is strictly prohibited;
6. The tube should be protected by the electric tube. When the three sets of wires enter the same box, another wire box must be provided. The ceiling box shall be reserved at the ceiling of the ceiling;
7. When the circuit project is completed, use electric light bulbs to test whether all sockets and light lines are powered on. Both strong and weak power should be carefully tested, and if the draw is a live line, it is forbidden to proceed to the next process;
8, after the acceptance to draw a precise circuit diagram to pay the owner to save (preferably to take pictures to save).
The fifth article: waterproof moisture production process
1. Clean the wall surface where waterproofing is required;
2, the surface of the waterproof coating brushing tightly twice, there are places where the pipe to be rolled up 20CM;
3, dry two days after the water pipes and floor drain plugging tight, put 5-8CM deep water for 48 hours of closed water experiments, to ensure that there is no leakage in the upstairs downstairs paving tiles, did not do the closed water test is strictly prohibited Brick;}
4, wall brush moisture-proof coating again, the best height is 1.5--1.8M, brushing should be tight;
5. The door and window cover and wood products shall be damp-proofed against the wall to prevent the occurrence of mildew and blackness in the event of subsequent exposure to moisture. During the production, the tung oil shall be evenly painted on the wall and the floor of the wood board.
Part 6: Woodworking Process
(Prerequisites) The original door frame shall be demolished and then re-insulated. The broken wall shall be made of wood products after the wall is powdered and dried. The front wall of the door and window cover shall be tightly protected against moisture. ,
In order to avoid wood products due to damp mold caused by peeling.


The seventh: door and window cover production process
1. The woodworking master hits the standing board and solid wood lines with an impact hammer to fix the eye. The wooden wedge is allowed to dry in the sun for one day. After the anticorrosive treatment, the nail is inserted into the already opened eye. When the cover is set, the wood is brushed against the wall and the tung oil is made again. Moisture treatment
2. Put a high-quality joinery board against the wall and brush the tung oil and then screw it into the wall. Use a level ruler and a wire camel to hold it horizontally, vertically, and squarely. The board is filled as tightly as possible. The edge of the blockboard station is sufficient to withstand the weight of the door leaf and the nail holding force of the hinge, and the door stop is made with a nine-percent board to make the dark side mouth, and the small wooden line head;
3, the door line with nine PCT board bottom, the side with solid wood small lines sealed, solid wood door lines and other solid wood lines should be purchased 4-5 days in advance, do not open the bundle on the site to dry, and the surrounding air integration, Nail windows and doors must be artificially set aside more than 1 mm of contraction, must not immediately close. Normally (Summer) shrinks more than 3 days, (Winter) shrinks more than 6 days and then closes again;
4, kitchen, bathroom door line and ground to set aside 1 cm spacing, so as not to pull the ground;
5. It is forbidden to use wood for windowsills. It is recommended to use natural stone, artificial stone, tiles, mosaics, etc.;
6. The production of window cover wood should be made after the natural stone or artificial stone is installed, so as to achieve a tight seam;
7. Wood products that need to be mixed with oil should be treated with “V” grooves in the line and contact of solid wood.
Part Eight: Door leaf production process
1. Flat door production: use two high-quality blockboards to form solid doors, and open the board to the corresponding slots with a depth of 3mm and a spacing of 12cm. Use woodworking glue to open the corresponding slots. The wood boards were laminated together, and the panels were decorated on both sides. The weight was more than 500 pounds on a flat surface for more than 10 days. During the pressing process, the front and back sides were flipped 3-4 times. After 10 days, the door blank was closed with solid wood lines. Solid wood lines must not be closed immediately after closing. Normally (Summer) shrinks more than 3 days, (Winter) shrinks more than 6 days and then closes again;
2. Concave-convex craft door production: The middle uses a high quality blockboard to open (ibid.) the corresponding groove, both sides are 9-12 PCT clamps, and the two sides are decorated with panels, and put on a flat surface with more than 500 pounds of weight to suppress 10 days. Above, during the pressing process, the front and back sides are flipped 3-4 times. After 10 days, the door blank is closed with solid wood lines. (Dry-shrinking process as above);
3, wardrobe door production process: the middle with 12-15 PCT board, 15 PCT must open the corresponding slot, on both sides of the decorative panel, where to reach the length of 140 cm above the door to be placed in the door on both sides of a stainless steel bar, put On the flat ground, more than 500 kilograms of weight is pressed for more than 10 days. During the pressing process, the front and back sides are flipped 3-4 times. After 10 days, the door blank is closed with solid wood lines. (Dry-shrinking process as above) The door width should not exceed 45 cm;
4, sliding door production process: work and other leaves almost the same, the track should be hidden in the door cover, both sides of the glass to use custom-made solid wood small clips, the ground positioner to be solid, the location should be reasonable.


The ninth article: no door wardrobe production
1, wood board frame, backplane nine PCT board, such as the use of Boeing film first backplane Boeing film affixed before nailing, when the vertical board and the cross-board affixed to the soundtrack to man-made outward mouth curled edge 3 - 4 mm, and then use a small line of solid wood to suppress the mouth to avoid warping. When working, pay attention to the sliding door to prevent the internal drawer from opening. (Note: The wardrobe interior can use Boeing film, mixed water paint, veneer, etc.);
2, the size of the drawer should be strictly in accordance with the size of the sliding door, the upper drawer and the drawer plate should be closed with a small solid wood (dry reduction process ibid), pants can not be higher than 1 meter;
3, the distance between the vertical boards can not exceed 1 meter, if more than 1 meter, it is necessary to add a vertical board, in order to avoid playing a long time pocket.
The tenth article: ceiling production process
1. Use the horizontal tube to find the horizontal point and use the ink fountain to horizontally stretch the horizontal line;
2. Light steel keel: wood keel is used as side dragon, lamp trough position is made of wood joist or wood board, wood fireproof paint is applied at the place where the wood is made, keel is at least 50 or more, spacing is 30 centimeters, pitch is 60-80 centimeters. It is advisable that between the gypsum board and the board, artificially set aside 5-8 mm gaps, and gypsum board surface self-tapping screws inset 1-2 mm and do anti-embroidering treatment to achieve smooth and firm, special shape to achieve smooth lines;
3, wooden keel: keel minimum 3 * 4 or more, spacing 30 centimeters is appropriate, hanger spacing 60-80 centimeters is appropriate, it is strictly forbidden to use wooden wedge-shaped nail directly to the top of the lifting bar, brush tight fire retardant paint until the invisible wooden keel color , After the upper layer of the keel is covered with a full-length willow core, the surface of the board is to be replaced with a gypsum board. Between the gypsum board and the board, an artificial gap of 5-8 mm shall be reserved, and the gypsum board surface shall be tapped with 1-2 mm of self-tapping screws. Anti-embroidering treatment, to be flat and firm, special-shaped to achieve smooth lines;
4. Aluminum buckle: Strictly require the level of operation, horizontal line, light steel keel teeth should be aligned, keel spacing within 50, hanger spacing 60-80 centimeters is appropriate, the upper hand when the board should be light, so as not to press the board out In the pit, the contact between the edge strips and the tiles is not strictly sealed with sealant;
5. Aluminium-plastic panel: Wooden keel should be at least 3*4 or more, spacing should be 30 centimeters, hanger spacing should be 60-80 centimeters, fire-retardant paint must be applied to the surface, and the keel should be covered with a layer of full-length willow core after 9 hours. Paste aluminum-plastic composite plate with all-purpose adhesive, between the aluminum-plastic composite plate and the plate to be artificially reserved 3-4 mm gap, has been prepared to fill other colors to play the sub-grid effect, to be flat and firm, special-shaped to achieve smooth lines , The corners of the folded surface should be sleek and not broken or shiny.


The eleventh: Deck wall production process
1. Suggestions for using brick walls should be made of bricks as far as possible (not more than 30 cm above or away from the beam);
2. The proposal that can not reach this condition is made of light steel keel. The specification of the main keel must be above 110. The solid dragon, the dragon and the main dragon and the clip must be installed firmly. The fixing point must be riveted, and the middle noise must be used. The cotton should be fixed with lead wire or copper wire. Between the gypsum board and the board, artificially set a gap of 5-8 mm. The gypsum board surface should be 1-2 mm from the tapping screw and do anti-embroidering. Shaped to achieve smooth lines, there are large materials to be reinforced at the door;
3, the use of wood keel is strictly prohibited.
Twelfth: Paint production (water paint)
1. Clean the site clean and remove all the tools and materials except the benches and ladders. The paint must be completed before the latex paint;
2. The hardware, such as door locks and hinges, should be protected; if there is a need for color change, they should be separated by color separation paper;
3, nail hole with oil putty (do not use transparent woolen cloth), especially rough veneer (black walnut, teak, oak, etc.) to be full of scraping the child once again, dry and then grinding 280 water sandpaper again;
4. Apply primer 2 times and dry 400 water sandpaper again;
5, and then on the primer two times, dry with water mill sand paper No. 600 again;
6, then paint it again, after drying with water mill 1000 water sandpaper again;
7, then paint it again, after drying with Shuimo 1200 water sandpaper again;
8, then paint it again, after drying with a fine cotton yarn polishing again, strictly prohibited;
9, the above workmanship must be closed tight doors and windows, clean the ground at any time, the paint work requires a clean environment, otherwise it is difficult to make a good article 13: paint production (mixed water paint)
1. Wood products with solid wood lines are used to open the “V” slot between the line and the panel when the carpenter works. The painter must fill the “V” slot with putty or self-adjusting putty so that cracking does not occur. With obvious traces of lines, the woodwork looks like a whole;
2, Putty with 2-3 or so putty putty or self-adjusting putty, it is recommended not to use putty, plastic putty shelling is very likely;
3. The following procedure is the same as that of clear water paint.
The fourteenth: paint production (mixed water clear)
There are two ways:
1, with the toner color, then paint with water;
2, color concentrates into the varnish directly spray.
The fifteenth: latex paint production process
1. Clean the site and brush the construction glue again and again;
2. Use the ink fountain to pop the straight line of Yin Yang angle, and use the gypsum powder or white cement to make the right angle of the yin and yang angle along the ink fountain line;
3. The cement wool wall should be covered with pure white cement. The white walls that the developer has already dealt with must be eradicated severely, and the white cement must be removed after eradicating. The powdered white wall should be finished with putty powder or self-adjusting putty. Put on the first pass;
4. After the first time putty is dry, put the finished putty on the floor twice.
5, the third pass is also used to put the finished putty (reminder: as the case may be, as long as the flat can be, putty too thick but not good, too thick place should not use finished putty, gypsum powder or white cement);
6, with 100-200 watt bulb side polished 600 water sandpaper;
7, on the anti-alkaline primer again and again to be dry (preferably scratch primer);
8, spray, roll or brush paint again (long hair roll first, followed by rolling with short hair again, this effect is better than spray, brush is good), to be dry; 99 door and window sleeve edge, small fine check repair Once, paint it again, (the last time the paint is best installed on the light and then on) Finish!


Chapter 16: Bricklayer Making Process
1, the original wall surface is too smooth, brushed paint, latex paint shall be used for eradication or roughing treatment, after the hair brush or powder cement slurry again, flat straight, for waterproof treatment (if needed), If the old house wall is removed to the red brick, it must be tiled 7 days after painting, and a small amount of water must be sprinkled on the wall before paving.
2. Before the tiles are laid, they must fully clean the ground, sprinkle with water, and dry with lines;
3, tile tiles must be carefully selected before the paving, soaking water, paving with horizontal lines, vertical lines, optimistic about the pattern, the bathroom, balcony and kitchen floor with floor drain to do a good return water, work to be Fine, 45-degree angle of the wall tile should be milled with whetstone on the basis of the cutting machine after the cutting machine, so as to not glaze, not burst, and feel smooth. The paving of kitchen, bathroom, balcony tiles and tiles is strictly followed by the procedures of wall pressing. Pure white mirror floor tile should be whitewashed before pure cement paste.
4, the kitchen, bathroom tiles need to be tiled, is strictly prohibited using wood production, use cement, yellow sand, broken bricks below the outer wall prevail, as far as possible to the smallest package;
5, brick tiles must be timely cleaned tile surface, not emptying, even after the completion of the paving even clean up the brick joints, fill sealant or white cement, repair all gaps;
6, tile finish is completed, the faucet interface wire to be flat or inset with the tile surface does not allow more than 5 mm;
7. 2 mm or more expansion joints should be reserved for tile and paving, and it is forbidden to apply seamless bricks with poor quality (without leaving expansion joints).
Chapter 17: Solid wood floor pavement process
1. The paving workers arrive at the house and report to their homes and ask the owner where they need to lay the floor and in which direction they should be paved;
2. Check if the floor is wet or not. (For paint and latex paint, the worker will usually sprinkle some water on the floor.) If wet, wait until the water content meets the requirements.
3. The thickness of the keel shall be regulated by the horizontal line, the position and distance of the fixed keel shall be calculated according to the length of the floor, and the straight line of the fixed dragon shall be ejected with the ink line;
4. Impact drills have fixed keel and nail holes for baseboards. The best nail spacing is 30 cm.
5, with the finished wooden wedge or homemade wooden wedge, it is best to once again on the wooden wedge of anti-corrosion oil (on the sun or fluorescent lamp to dry the water), and then nailed to drill inside the nail;
6, sweep the dust;
7. Fix the keel with 2 inch or more loose flower nails. The nail head is 1-2 mm into the keel. The keel can be found (planed) and cleaned with a line.
8, the use of ink fountains to the keel center line and the wall as the basis of the floor paving straight line;
9. Pre-paving the floor will change the color difference to the most ideal state. Please ask the owner for approval. It is recommended that the floor with the larger color difference be placed under the bed and the cabinet;
10. The insect repellent is evenly spread on the ground. The damp-proof film is spread across the ground dragon in the opposite direction of the woodland dragon. The joints must cross 10 cm. (Add a layer of moisture-proof film under the keel on the first floor)
11, in order to avoid mistakes in the floor has been paved off, it is recommended to pick up the floor in the opposite side of each floor marked with a font size, and then along the label to paved the floor;
12, when the floor paving joints to be placed in the middle of earthworms, can not deviate too much, the floor should first use the pistol drill due to 1.5-inch loose nails fixed on the keel, between each board and the board to add packaging tape For expansion joints (approx. 0.2 mm), expansion joints with a thickness of 0.5 cm or more must be reserved by the wall, and glue must not be applied between the joints.
special reminder:
1. There are households that install radiators. After the ground dragons have been laid, put the radiators on the floor before installing them. Test the water pressure to ensure that there is no leakage before paving the floor;
2. After all the sanitary fixtures and hardware fittings are installed, test the water pressure again to see if there is any leakage.

Three trees Lacquer Nature Flooring Lacquer-cement Lacquer-emulsion paints Craftsmanship Glass Drawers Cabinets Doors Kitchen ceilings Red brick Glass doors Glass bricks Glass sliding doors Glass sliding doors Kitchen sliding doors Flooring tiles Kitchen cabinet doors Kitchen glass Sliding doors Glass doors Kitchen Wall Tiles Bathroom Sliding Doors Bathroom Tiles Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Door Size Bathroom Size Toilet Ceiling Bathroom Sliding Door Toilet Waterproof Bathroom Floor Tile Toilet Leaking Tile Tile Tile Floor Tile Tile Balcony Tile Kitchen Tile