System required for non-excavation construction

The non-excavation system required for non-excavation construction is the main way of underground construction, but the non-excavation project is not completed by one equipment, and multiple equipments are needed. The non-excavation project is smooth. The four systems required for construction:

The four major systems used in the non-excavation project are the rig system, the mud system, the power system and the control system.

Each of the four systems has its own advantages and performance. First of all, the function of the rig system is to place it on the drill frame to quickly complete the drilling and dragging operations.

The mud system provides the mud system with the mud suitable for drilling conditions, which guarantees the timely completion of the operation.

The power system provides power and electricity during construction.

The steering system is the main system that mainly monitors the construction location. The specific position and other parameters of the drill bit can be monitored and controlled by the computer.

Although the non-excavation project can complete the pipeline construction without destroying the road surface, it requires more equipment and is indispensable.



This article is reproduced from Bazhou Lutong Engineering Co., Ltd.: http://
Http://news.chinawj.com.cn System required for non-excavation construction Submission: 'Systems required for non-excavation construction

Adjustable Raised Floor Pedestals

Raised Floor Pedestal,Adjustable Raised Floor Pedestal,Adjustable Plastic Pedestals,Adjustable Raised Floor Plastic Pedestal

Jiangxi Taurus Technology Co., Ltd , http://www.chinapedestal.com