Things You Must Know About Decoration

Things You Must Know About Decoration

Decoration is no small matter, everything is bothered. As for the decoration, it seems that there is always something that can't be said. In fact, this is indeed the case. Any changes in the details of the decoration may change the overall decoration style. Today's exchange with you is about the capital aspects of renovation, about the budget, the budget and the final accounts.

First spread the concept of these three words. Before you hand in the money, call the budget estimate; pay the money to sign the contract before the contract is called; when all the decoration is finished, call the final account. These concepts are actually quite simple, but there are many things to pay attention to.

The general decoration company will promise that if the demand does not change, the final budget will not exceed 5% of the budget. Of course, a person with a bit of brain will know that the so-called upper and lower range is actually going up. The budgetary period is not guaranteed. So be careful when making budget estimates. It's best to think about everything:

1. The housing structure changes. Wall knocking is very expensive, especially for walls, so you have to think about what materials are used to build walls.

2, paving or flooring, if it is a floor decoration company as long as the ground is basically no cost, and the paving will involve the cement leveling, paving artificial, etc., basically more than 50 labor costs, cement yellow sand It takes 20-30, so you have to decide in advance which areas you want bricks to floor. Also if you are doing floor heating, then even if you shop floor, you need cement leveling, and the thickness should be about 6-8cm, and the cement material needs to increase the bean stone and the melon seeds, the price is more than 70 one flat, very expensive.

3, or paving bricks, if you are right-angle shop, which is the vertical shop and the wall is very simple, but also the cheapest. And if you are a bevel shop, that is, a traditional diamond shop, then the process fee goes up, and there are small blocks in the middle of some American villages, then you have to add more labor. The smaller the bricks, the more expensive the labor.

4. What grade of material should be used to determine, such as water pipe wires, paint brands, wood, etc. These must be determined. In particular, wood, the use of a good difference in the number of plates, such as the board, not environmentally friendly but super cheap, for example, you have to strengthen some areas with wood panels, very expensive, and some cabinets are also used wood panels. The wardrobe is usually made of unpainted fir finger-joint panels. This is quite expensive, and the thickness of the wood is generally 1.8cm. In fact, it is very thin. If you want to thicken it, you must add money. There is the water pipe is 6 in charge or 4 in charge, whether it is all hot water pipe, what brand, wire 2.5 square or 4 square, and what brand of paint is what model.

5, the number of holes, why do you want to make holes? Because the wire hoses can only pass through the wall, you should pay attention to the hole. Generally, the decoration company will give you enough of 20, but you have to keep an eye on it. Especially if you require large-scale circuit reconstruction, basically it is not enough.

6, ceiling, this piece is also very tricky, and generally they will say I'll give you 20 square ceilings, enough, but remember that this 20 square is flat, that is the area of ​​a wall, if you want To do modeling, first of all, the plaster line is your own to buy, and there is the process to add money.

7. If you are smart enough to die, you will also be neglected. The difference between the estimated budget and the largest budget is mainly the height of the wall. Many of them say that they are calculated according to the square, such as paint, but because your houses are of different heights, they will say very much. It's hard to think about it. Therefore, you should pay attention to the fact that the height of the best calculation can be refined. For example, if the average house is 2.7m high, then you should let him be 2.7m.

Many people will feel that saving as much as possible in the budget estimation or budgeting stage seems to be the case, but in fact, you will regret it when it is actually done. For example, if you say that the fir fingerboard is too expensive and all use the board, it seems that the budget estimate or the budget is cheap. However, in fact, in the actual construction process, most of them will become environmentally friendly, and then the money will go up. Some people say that it's not a matter of floating 5%, but that's beyond their responsibility. You are stupid, you are changing the demand, so it is not within that range, businesses are raped. So tell you that when doing budget estimates and budgets, you should do as much as possible, otherwise it is natural that the budget is beyond.

If there is a budget or an estimate, if you go big, the final number will not satisfy you. What should I do at this time? My suggestion at this time is to start bargaining with the boss, but remember that you cannot reduce the number or reduce the material, otherwise you are still on the road. Really can not discuss the price, then run more companies, use the same amount to compare.

Here we have to explain that during the estimate period, the decoration company will not give you information, but it will be shown to you on the spot. So if you can, you can secretly take pictures, or count the numbers in each block, so that you can make some comparisons. If you only compare big numbers, it is hard to bargain. For example, if Wood A company is 50 flat and B company is 30 flat, then you can safely choose company B. Of course, when A and B companies offer the same total price, you have to look at the details. Where are the differences between the two companies? Are these areas more concerned to you? Generally speaking, the higher the price, the better the material is. So pay more attention to these details.

The budget quotation will give you a copy, but you have already paid the design fee as a deposit at this time and you basically can't run away. And finally speaking about the final accounts, I have not yet reached this stage. But I can say with responsibility that the final account must be done according to the actual situation, and you will not be asked to receive a penny. But you can get out of the sub-items in the budget that do not have any changes in requirements. In contrast, to ensure that those who have floated 5% can keep the bottom line.